Retain or repair upper structure
Cohen resurfaces existing framing. ACS replaces joists as needed. MAT-CON describes post-demo framing inspection and T&M repairs, but also says “remove…framing”; confirm the intended scope.
Five proposals · July 2026
The headline prices are not apples-to-apples. This review separates the numbers from what is actually being built—so the decision comes down to structure, scope, and risk.
At a glance
Cohen and ACS retain existing upper framing/structure. Get It Rite and NexLevel rebuild it. MAT-CON appears to be a resurfacing proposal, but its framing language conflicts and needs written clarification. Only two bids include a lower dog deck.
Cohen resurfaces existing framing. ACS replaces joists as needed. MAT-CON describes post-demo framing inspection and T&M repairs, but also says “remove…framing”; confirm the intended scope.
Get It Rite and NexLevel include complete demolition and all-new upper framing.
Cohen includes a new composite dog deck. ACS includes a 12×22 lower deck with treated or Trex Lineage composite decking.
Mobile-friendly bid cards
Each card leads with configuration and scope—not just the total.
Composite · two deck areas
$49,228.46
One stated configuration
TimberTech Prime+ upper resurfacing, black TimberTech Impressions railing, new pergola, and a new lower composite dog deck with new framing.
The upper deck is resurfaced, not rebuilt. Confirm who absorbs hidden framing repairs after the boards come off.
Three configurations · two deck areas
$50,746
Trex Lineage + Westbury
$37,631
Aluminum-rail treated
$26,450
All-treated alternative
Composite addendum: $31,217 upper + $15,600 lower + $3,929 pergola = $50,746. Aluminum option: $22,972 upper + $10,730 lower + $3,929 pergola. All-treated option: $15,308 upper + $7,213 lower + $3,929 pergola.
The existing upper structure remains. Work names three posts/brackets; footings are evaluated, not automatically replaced. The handwritten $31,217 composite-upper total is $10 higher than the original $22,972 plus its stated $7,335 material and $900 permit lines; require a corrected written total.
Composite or treated · upper only
$36,947
Composite
$27,947
Treated
Complete elevated-deck demo and rebuild with all-new treated framing; Trex Enhance Basics + Westbury on the composite option.
A strong upper-rebuild price cannot be compared directly until a lower-deck add-on and missing line items are quoted.
Composite · upper only · 430 sq ft
$48,765.78
Includes $1,880.13 financing charge
$46,885.65 exact subtotal before financing
Full demo/rebuild with treated substructure, TimberTech Prime+, aluminum railing, composite fascia, stairs, two gates, and 14×16 pergola.
A $1,000 discount was valid only on the estimate date. Confirm whether it is reflected in the listed numbers; do not assume it remains available.
Trex Transcend · upper only
$29,539.00
Proposal dated 7/23/26 · License BC631506
Remove old decking, handrails, and lattice; install Trex Transcend decking and black AFCO 200 Series handrails; haul away old decking and handrails; and build a new 4-foot-wide stairway with a gate at the top.
The proposal is internally inconsistent: its opening line says remove decking, handrails, lattice “and framing,” but a later line says inspect framing after decking removal and charge only needed framing at time and materials. Treat this as resurfacing with uncertain repair exposure unless MAT-CON confirms otherwise in writing. Payments are one-third at start, one-third when decking and handrails are off, and one-third at completion.
Desktop comparison grid
Green means expressly included, gray means expressly excluded, and amber flags something conditional or not clear from the proposal.
On smaller screens, use the bid cards above for the same core comparison without horizontal scrolling.
Normalize before choosing
Ask for written, fixed-price answers or clearly stated allowances. That turns five different proposals into a decision you can defend.
Price the same 12×22 lower dog deck, with the same decking, railing, stairs, gate count, framing, and footings.
Are permit fees, plan review, inspections, sales tax, and any engineering costs included in the total?
How many self-closing or standard gates are included, where are they located, and what hardware is specified?
Confirm stair count, width, landings, railing, stringer material, lighting or code upgrades, and upper versus lower locations.
For retained framing, define the included repair allowance, unit prices, approval process, and maximum exposure after demolition.
State the exact count and type, whether existing footings pass inspection, and the price if any must be replaced or upgraded.
Confirm joist tape coverage, ledger flashing, beam/post protection, and the exact products used.
Lock the product lines, board profiles, colors, railing series, fasteners, and manufacturer plus workmanship warranties.
Provide deposit and milestone schedule, change-order markup, cancellation terms, start window, duration, and final-payment trigger.
Bottom line
The “best” bid changes depending on whether the current upper structure is worth keeping.
Lowest stated two-area option if the upper structure is sound and treated materials are acceptable
ACS’s $26,450 all-treated package is its lowest stated total for the upper work, 12×22 lower deck, and pergola. The $37,631 aluminum-rail option covers the same core areas with treated decking and adds an $11,181 premium over the all-treated package for the aluminum-railing configuration; it is $11,597.46 below Cohen. ACS also states a $50,746 Trex Lineage + Westbury package for both deck areas and the pergola—$1,517.54 above Cohen—subject to correcting the addendum’s $10 upper-total discrepancy. Every ACS choice depends on retaining the upper structure and existing footings; confirm permit, tax, stair, and disposal details for the selected configuration, and require a documented structural/footing assessment with a capped repair allowance.
Recommended next move
Use the nine questions above and require a final total for the same upper deck, 12×22 lower dog deck, pergola, stairs, gates, permits, tax, disposal, and footing strategy. Then compare the revised contracts—not today’s headlines.